Products — High-Level

High-Level Palletizing Systems

Infeed conveys above the pallet for continuous, high-speed production — including dual-infeed configurations that merge two production lanes into one palletizing station.

70,000

BPH — dual-infeed reference case

2 → 1

Lines merged (dual-infeed)

Servo

Layer forming drive

PLC

Full automatic control

Configurations

Single-lane vs dual-infeed

Both run on the same high-level platform — the difference is how many production lanes feed into it.

Standard

Single-lane high-level

  • One production line feeds one palletizer
  • Suited to a single SKU or format running continuously
  • Smaller footprint than a dual-infeed setup

Reference case: 70,000 BPH

Dual-infeed high-level

  • Two production lines merge into one palletizing station
  • Doubles throughput without doubling floor space
  • Suited to plants running parallel filling lines

System

What's included

Elevated infeed conveyor

Conveys product above the pallet position, feeding the layer-forming station. Length and lane count configured to your line layout.

Layer forming station

Arranges product into a stable layer pattern before lowering onto the pallet.

Pallet lift/lower mechanism

Indexes the pallet down as each layer is completed, maintaining consistent drop height.

Control cabinet

PLC-based full automatic control with layer pattern programming.

Details

Common questions

Do we need dual-infeed, or is single-lane enough?

If you’re running one filling line, single-lane high-level is typically sufficient. Dual-infeed is for plants merging two parallel lines into a shared palletizing station.

What output speed can this handle?

Our dual-infeed reference case runs 70,000 bottles per hour across two merged lines. Standalone single-lane capacity is specified per configuration based on your product and line speed.

How does this differ from robotic palletizing?

High-level systems are built for one continuous, high-volume format. Robotic palletizing offers more flexibility across formats and layouts, typically at lower peak throughput.

How is installation handled?

Installation is guided through video walkthroughs and live video commissioning support, with on-site engineer deployment available where required.

Get a configuration for your line

Send us your output speed, bottle/container size and whether you’re merging lines — we’ll return a configuration and quote.

Scroll to Top